Summary for Test 2021-07-14-55-4

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 215095
DEA: 11419304
EFIS: 1115000042
DIST-CO-RTE-PM11-SD-78-N17.6/R21.3
Award Date11/03/2020
Closeout Date09/14/2023
Work DescriptionPLACE HMA AND RHMA, CURB RAMPS, AND ELECTRICAL WORK.
Location DescriptionSAN DIEGO COUNTY IN AND NEAR ESCONDIDO FROM 0.1 MILE WEST OF NORTH BROADWAY TO FLORA VISTA STREET
QA Service Level1 (Verified on 11/25/2020)

Sample Information

Sample Taken Date07/14/2021 Sample Unique Key55
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/14/2021
Sample typeAcceptance A brief description of the samplePG Asphalt Binder
The quantity of what the sample constitutes1 Quart Can From where was the sample collectedSupplier
First name of sampler or witnessed byD Last name of sampler or witnessed byCarrera
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan-Carroll Canyon Transportation Laboratory (TL) NumberC963252
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 70-10
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierSan Joaquin Refinery - Bakersfield CA MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2021-07-14-55
DIME Test ID: 2021-07-14-55-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-10-27

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 10/26/2021
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 166.194 grams
Mass of empty container #2: 169.381 grams
Mass of container #1 before test (m1i): 201.202 grams
Mass of container #2 before test (m2i): 204.327 grams
Mass of container #1 after test (m1f): 201.190 grams
Mass of container #2 after test (m2f): 204.315 grams
Average mass change: -0.034 percent
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/27/2021