Summary for Test 2021-10-08-17-2

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 214685
DEA: 024E46U4
EFIS: 0216000122
DIST-CO-RTE-PM02-LAS-36-6.0/14.6
Award Date05/08/2020
Closeout Date08/14/2023
Work DescriptionREPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK.
Location DescriptionLASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD
QA Service Level1 (Verified on 03/02/2020)

Sample Information

Sample Taken Date10/08/2021 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/09/2021
Sample typeAcceptance A brief description of the sample3/8 Inch RAP
The quantity of what the sample constitutes1 bag RAP for PSE From where was the sample collectedManufacturer
First name of sampler or witnessed byJ. Last name of sampler or witnessed byDelgado
Title of samplerConsultant Telephone number of sampler
Laboratory sample identificationD78954 Linked DIME Sample ID2021-10-08-16, 2021-10-08-18
The fabricator/manufacturer/facility nameHat Creek Construction, Ward Lake Plant, Litchfield, CA Transportation Laboratory (TL) Number695653
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceHat Creek Construction and Materials, Ward Lake Facility, Litchfield, CA
Aggregate Size3/8 Inch Aggregate SourceUnknown
RAP StockpileContinuous Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-10-08-17
DIME Test ID: 2021-10-08-17-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-10-21

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 10/11/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.41 %
General comments (publicly viewable) (Max 1000 characters): Uncorrected binder content of RAP

Test was verified on 10/21/2021