Summary for Test 2021-09-24-16-10

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 215697
DEA: 07318204
EFIS: 0715000286
DIST-CO-RTE-PM07-LA-Route 1-4.0/4.2
Award DateNot set
Closeout DateNot set
Work DescriptionCM/GC Project - Work consists of constructing secant wall and slope restoration
Location Descriptionnear Point Mugu State Park 0.4 mile South of Sycamore Canyon Road.
QA Service Level1 (Verified on 08/26/2021)

Sample Information

Sample Taken Date09/24/2021 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/29/2021
Sample typeVerification A brief description of the sampleJMF 1/2" HMA-A-SP R15 No LAS
The quantity of what the sample constitutes6 Bags Aggregate, 2 Bags RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byAlex and Zaid Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0561A-21 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAll American Asphalt-Irwindale Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sample1/2 HMA-A-SP R15 The fabricator/manufacturer designation for the sample
The plant number104775 A detailed description of where the material sample was collectedBelt Cut at All American Irwindale Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-09-24-16
DIME Test ID: 2021-09-24-16-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-10-12

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Dominic Montemayor, Satish Jain
Date of test: 10/11/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 95 %
Cumulative percent passing the 3/8 in. sieve: 81 %
Cumulative percent passing the #4 sieve: 54 %
Cumulative percent passing the #8 sieve: 37 %
Cumulative percent passing the #16 sieve: 24 %
Cumulative percent passing the #30 sieve: 17 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 5.3 %
General comments (publicly viewable) (Max 1000 characters): Combined RAP/Virgin Aggregate Gradation w/Correlation Factors Applied

Test was verified on 10/12/2021