Summary for Test 2021-08-20-63-1
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 214756 DEA: 050N7AU4 EFIS: 0520000030 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-1.4/4.8 |
Award Date | Not set |
Closeout Date | 09/27/2022 |
Work Description | Segment 4A - Carpinteria: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, epoxy coated rebar, precast box culverts, precast RCP. |
Location Description | CARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE |
QA Service Level | 1 (Verified on 03/09/2020) |
Sample Information
Sample Taken Date | 08/20/2021 | Sample Unique Key | 63 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/20/2021 |
Sample type | Quality Control | A brief description of the sample | PCC |
The quantity of what the sample constitutes | 3 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Erroll | Last name of sampler or witnessed by | Benton |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hanson - Goleta | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 63511N0P |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 549407 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Retaining Wall 2B | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-08-20-63
DIME Test ID: 2021-08-20-63-1
Testing Lab: Sequoia Consultants
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2021-10-11
Test Results
Unit system used?: US Units
Number of specimens: 1
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Tim Reyes
Date of test: 09/17/2021
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 6.00 in
Maximum load on cylinder 1: 129930 lb
Type of fracture pattern of cylinder 1: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Compressive strength of cylinder (to nearest 10 psi): 4610 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/11/2021 ✔