Summary for Test 2021-09-29-21-4

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 215129
DEA: 050N73U4
EFIS: 0520000166
DIST-CO-RTE-PM05-SB-101-7.3/9.6
Award Date10/23/2020
Closeout DateNot set
Work Description!!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location DescriptionSUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
QA Service Level1 (Verified on 08/24/2020)

Sample Information

Sample Taken Date09/29/2021 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/29/2021
Sample typeQuality Control A brief description of the sample1" , 3/8" , sand
The quantity of what the sample constitutes3 bags From where was the sample collectedSource
First name of sampler or witnessed byTim Last name of sampler or witnessed byReyes
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHanson Goleta Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-42-0003
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number725A1Z0P Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-09-29-21
DIME Test ID: 2021-09-29-21-4
Testing Lab: Sequoia Consultants
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-10-11

Test Results


What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Tim Reyes
Date of test: 09/29/2021
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 92 %
Cumulative percent passing the 1/2 in. sieve: 61 %
Cumulative percent passing the 3/8 in. sieve: 34 %
Cumulative percent passing the #4 sieve: 6 %
Cumulative percent passing the #8 sieve: 1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/11/2021