Test 2021-10-01-9-6 (AASHTO T301-13) Summary

Project Information
Project IdentifiersProject ID: 44444
DEA: ASCP
EFIS: ASCP
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Asphalt Supplier Certification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date10/1/2021 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/1/2021
Sample typeQuality Control A brief description of the sampleModified Asphalt Binder
The quantity of what the sample constitutes1 of 2 From where was the sample collectedManufacturer
First name of sampler or witnessed byDon Last name of sampler or witnessed byConner
Title of sampler Sr Asphalt Technician Laboratory sample identification6428211001
The fabricator/manufacturer/facility nameBakersfield, CA Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number6428211001
Sublot number Tank number5005
Time of sample7:00 am HMA Supplier
Asphalt Binder SupplierSan Joaquin Refinery - Bakersfield CA MultigradeNo
Multigrade Type HMA Design ID
Test Details
DIME Sample ID: 2021-10-01-9
DIME Test ID: 2021-10-01-9-6
Testing Lab: San Joaquin Refinery - Bakersfield
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-10-07
Test Results

Input Type: Calculated
Tester's full name: John Partenan
Date of test: 10/01/2021
% Elongation Recovery: 86 %
General comments (publicly viewable) (Max 1000 characters): Test @ 25C

Test was verified on 10/07/2021