Summary for Test 2021-09-03-15-1
Test performed: CONCLP 2-16Project Information
Project Identifiers | Project ID: 215096 DEA: 11428104 EFIS: 1117000028 |
---|---|
DIST-CO-RTE-PM | 11-SD-8-R0.3/R23.0 |
Award Date | 10/20/2020 |
Closeout Date | 09/14/2023 |
Work Description | CULVERT REPAIRS, CONC. INVERT PAVING, MODIFY LANDSCAPE AND ELECTRICAL. |
Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM MORENA BOULEVARD UNDERCROSSING TO 1.1 MILES EAST OF LAKE JENNINGS PARK ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 11/25/2020) |
Sample Information
Sample Taken Date | 09/03/2021 | Sample Unique Key | 15 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/03/2021 |
Sample type | Authorization | A brief description of the sample | Rapid Set |
The quantity of what the sample constitutes | 1 Bucket | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Manufacturer | Last name of sampler or witnessed by | Aquafin |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Aquafin Building Product Systems | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Rapid Set | Manufacturer | Aquafin Building Product Systems |
---|---|---|---|
Mix no. | 3555 | Materials Received | Pavemend SL |
Lot no. | 21510221 | Batch no. | 21510221 |
Test Details
DIME Sample ID: 2021-09-03-15
DIME Test ID: 2021-09-03-15-1
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CONCLP 2-16: Rapid Set Patching Materials
Test Release Date: 2021-09-24
Test Results
Input Type: Measured
Tester's full name: Spencer Adams
Date of test: 09/24/2021
Compressive Strength @ 3 hrs (CTM 551): 5790
Compressive Strength @ 24 hrs (CTM 551): 7530
Flexure Strength @ 24 hrs (CTM 551): 0
Bond Strength @ 24 hrs - SSD (CTM 551): 0
Bond Strength @ 24 hrs - Dry (CTM 551): 0
Water Absorption (CTM 551): 0
Abrasion @ 24 hrs (CTM 550): 25
Drying Shrinkage @ 4 days (CTM 596): 0
Soluble Chlorides (CTM 422): 0
Water Soluble-Sulfates (CTM 417): 0
Material Weight: 51.8
Water Weight: 4.17
General comments (publicly viewable) (Max 1000 characters): Initial Set 19 minutes / Final Set: 20 minutes
Test was verified on 9/24/2021 ✔