Summary for Test 2021-07-26-43-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215628 DEA: 043Q4604 EFIS: 0419000214 |
---|---|
DIST-CO-RTE-PM | 04-SON-128-0.0/L4.8,L4.9/12.2 |
Award Date | 05/10/2021 |
Closeout Date | 02/03/2023 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE HMA-A. |
Location Description | SONOMA COUNTY NEAR CLOVERDALE AND GEYSERVILLE FROM MENDOCINO COUNTY LINE TO NORTH JUNCTION ROUTE 101 AND FROM ROUTE 101/128 SEPARATION TO SAUSAL CREEK BRIDGE |
QA Service Level | 1 (Verified on 04/02/2021) |
Sample Information
Sample Taken Date | 07/26/2021 | Sample Unique Key | 43 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/07/2021 |
Sample type | Acceptance | A brief description of the sample | PG64-16 |
The quantity of what the sample constitutes | 1 can | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Casy | Last name of sampler or witnessed by | P |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | BoDean Santa Rosa | Transportation Laboratory (TL) Number | c044235 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-26-43
DIME Test ID: 2021-07-26-43-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-20
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/14/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 175.886 grams
Mass of empty container #2: 174.168 grams
Mass of container #1 before test (m1i): 211.339 grams
Mass of container #2 before test (m2i): 210.139 grams
Mass of container #1 after test (m1f): 211.272 grams
Mass of container #2 after test (m2f): 210.065 grams
Average mass change: -0.197 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 9/20/2021 ✔