Summary for Test 2021-08-30-29-2

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 215393
DEA: 021J5104
EFIS: 0220000086
DIST-CO-RTE-PM02-LAS,MOD-139-57.0/66.635,0.0/0.1
Award Date02/10/2021
Closeout Date11/24/2021
Work DescriptionPERFORM COLD IN-PLACE RECYCLING AND PLACE HOT MIX ASPHALT (TYPE A).
Location DescriptionLASSEN AND MODOC COUNTIES NEAR ADIN FROM 4.5 MILES SOUTH OF COUNTY ROAD A2 TO 0.1 MILE SOUTH OF ROUTE 299
QA Service Level1 (Verified on 01/07/2021)

Sample Information

Sample Taken Date08/30/2021 Sample Unique Key29
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/31/2021
Sample typeAcceptance A brief description of the sample3/8 inch RAP
The quantity of what the sample constitutesPSE 1 bag at 286 Tons From where was the sample collectedManufacturer
First name of sampler or witnessed byE. Last name of sampler or witnessed byChavez
Title of samplerMaterials Tester Telephone number of sampler
Laboratory sample identificationD78933 Linked DIME Sample ID
The fabricator/manufacturer/facility nameHat Creek Construction and Materials - Shaw Pit Facility - Lookout, CA Transportation Laboratory (TL) Number848954
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceHat Creek Construction and Materials, Shaw Pit Facility, Lookout, CA
Aggregate Size3/8 inch Aggregate SourceHat Creek Construction
RAP StockpileContinuous Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-08-30-29
DIME Test ID: 2021-08-30-29-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-09-09

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 09/01/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.86 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/9/2021