Test 2021-08-26-28-1 (ASTM D217-16) Summary

Project Information
Project IdentifiersProject ID: 215627
DEA: 032G2004
EFIS: 0321000024
DIST-CO-RTE-PM03-YOL-128-0.0/9.8
Work DescriptionPLACE RHMA AND REPLACE ASPHALT CONCRETE.
Location DescriptionYOLO COUNTY IN AND NEAR WINTERS FROM PUTAH CREEK BRIDGE TO ROUTE 128/505 SEPARATION
Sample Information
Sample Taken Date8/26/2021 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing8/27/2021
Sample typeAcceptance A brief description of the sampleTEST 8/26, NO TEST 8/27, 8/30
The quantity of what the sample constitutes3 cans From where was the sample collectedSource
First name of sampler or witnessed bykHAIR Last name of sampler or witnessed bymOHAMMAD
Title of samplerARE Laboratory sample identification
The fabricator/manufacturer/facility nameMarathon Transportation Laboratory (TL) Number4679587
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-08-26-28
DIME Test ID: 2021-08-26-28-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2021-09-03
Test Results

Determination: Unworked Penetration
Input Type: Measured
Tester's full name: Minoo Ahmadi
Date of test: 09/03/2021
Unworked Penetration, Test 1: 22 0.1 mm
Unworked Penetration, Test 2: 22 0.1 mm
Unworked Penetration, Test 3: 24 0.1 mm
Unworked Penetration:23 0.1 mm
General comments (publicly viewable) (Max 1000 characters): 2018 per spec.

Test was verified on 09/03/2021