Test 2021-07-19-53-2 (AASHTO T301-13) Summary

Project Information
Project IdentifiersProject ID: 44444
DEA: ASCP
EFIS: ASCP
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Asphalt Supplier Certification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date7/19/2021 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/18/2021
Sample typeVerification A brief description of the sampleBINDER
The quantity of what the sample constitutes4 CANS From where was the sample collectedFabricator
First name of sampler or witnessed byKevin Last name of sampler or witnessed byMcKinney
Title of samplerCOC Program Laboratory sample identificationc71921PMA4
The fabricator/manufacturer/facility nameMarathon Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number Tank numberPMA4
Time of sample0830 HMA Supplier
Asphalt Binder SupplierMarathon Petroleum Co. LP - Bakersfield CA MultigradeNo
Multigrade Type JMF Verification ID
Test Details
DIME Sample ID: 2021-07-19-53
DIME Test ID: 2021-07-19-53-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-09-13
Test Results

Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/01/2021
Final Reading from the testing machine (X): 3 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/13/2021