Test 2021-08-16-41-5 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 215257
DEA: 11056374
EFIS: 1117000087
DIST-CO-RTE-PM11-SD-11-0.6/2.7
Work DescriptionCONSTRUCT INTERCHANGE, PLACE JPCP, HMA, AND INSTALL LIGHTING.
Location DescriptionSAN DIEGO COUNTY NEAR SAN DIEGO FROM 0.2 MILE WEST OF SANYO AVENUE UNDERCROSSING TO 1.2 MILE EAST OF ENRICO FERMI DRIVE OVERCROSSING
Sample Information
Sample Taken Date8/16/2021 Sample Unique Key41
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/16/2021
Sample typeQuality Control A brief description of the sampleConcrete Aggregate
The quantity of what the sample constitutes30 CY From where was the sample collectedFabricator
First name of sampler or witnessed byRodrigo Last name of sampler or witnessed byLupian
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameRobertsons Otay Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameDS 10 Box culvert - 60 walls and rood
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-37-0020
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedconveyor belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberRRM 21063 Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-08-16-41
DIME Test ID: 2021-08-16-41-5
Testing Lab: Sequoia Consultant
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-09-15
Test Results

What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Larry Fukushima
Date of test: 08/16/2021
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:98 %
Cumulative percent passing the #8 sieve:82 %
Cumulative percent passing the #16 sieve:60 %
Cumulative percent passing the #30 sieve:39 %
Cumulative percent passing the #50 sieve:19 %
Cumulative percent passing the #100 sieve:7 %
Cumulative percent passing the #200 sieve:2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/15/2021