Test 2021-07-19-52-2 (AASHTO T51-13) Summary

Project Information
Project IdentifiersProject ID: 44444
DEA: ASCP
EFIS: ASCP
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Asphalt Supplier Certification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date7/19/2021 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/18/2021
Sample typeVerification A brief description of the samplePG64-16
The quantity of what the sample constitutes4 CANS From where was the sample collectedFabricator
First name of sampler or witnessed byKevin Last name of sampler or witnessed byMcKinney
Title of samplerCOC Program Laboratory sample identificationc7192125001
The fabricator/manufacturer/facility nameMarathon Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number25001
Time of sample0830 HMA Supplier
Asphalt Binder SupplierMarathon Petroleum Co. LP - Bakersfield CA MultigradeYes
Multigrade TypePG 64-16 / PG 64-10 JMF Verification ID
Test Details
DIME Sample ID: 2021-07-19-52
DIME Test ID: 2021-07-19-52-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2021-09-02
Test Results

Is a normal test obtainable?: Yes
Number of replicates tested: One
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 08/25/2021
Ductility of test #1 (D1): 150 cm
Ductility of sample:150 cm
General comments (publicly viewable) (Max 1000 characters): 150+

Test was verified on 09/02/2021