Test 2021-07-16-59-2 (AASHTO T301-13) Summary

Project Information
Project IdentifiersProject ID: 215536
DEA: 09383504
EFIS: 0920000044
DIST-CO-RTE-PM09-MNO-395-R40.1/R44.8
Work DescriptionPLACE HMA OVER EXISTING PAVEMENT.
Location DescriptionMONO COUNTY ABOUT 7 MILES SOUTH OF LEE VINING FROM 0.2 MILE SOUTH OF ROUTE 158 TO 0.6 MILE NORTH OF LA AQUEDUCT BRIDGE
Sample Information
Sample Taken Date7/16/2021 Sample Unique Key59
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing8/13/2021
Sample typeAcceptance A brief description of the samplePG58-34M
The quantity of what the sample constitutes1 can From where was the sample collectedManufacturer
First name of sampler or witnessed by_ Last name of sampler or witnessed by_
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameGranite Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Formc661379 Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Asphalt Binder SupplierPNAC LLC - Fernley NV MultigradeNo
Multigrade Type HMA Design ID
Test Details
DIME Sample ID: 2021-07-16-59
DIME Test ID: 2021-07-16-59-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-08-26
Test Results

Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 08/16/2021
Final Reading from the testing machine (X): 5 cm
% Elongation Recovery: 75 %
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications

Test was verified on 08/26/2021