Test 2021-05-11-33-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 214426
DEA: 030A5704
EFIS: 0300020593
DIST-CO-RTE-PM03-YUB-20-13.3/R18.2
Work DescriptionBrowns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location DescriptionYUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
Sample Information
Sample Taken Date5/11/2021 Sample Unique Key33
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing7/12/2021
Sample typeVerification A brief description of the sampleRAP 1/2"
The quantity of what the sample constitutes1 bag From where was the sample collectedSupplier
First name of sampler or witnessed byKenny Last name of sampler or witnessed byMcHugh
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameTeichert Hallwood Drum Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeReclaimed Asphalt Pavement RAP SourceTeichert Hallwood Drum Plant
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
JMF Verification ID JMF3513-2021-68
Test Details
DIME Sample ID: 2021-05-11-33
DIME Test ID: 2021-05-11-33-1
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-08-13
Test Results

Input Type: Calculated
Tester's full name: Teichert Hallwood Personnel
Date of test: 07/12/2021
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:4.35 %
General comments (publicly viewable) (Max 1000 characters): JMF 21-028

Test was verified on 08/13/2021