Summary for Test 2021-07-14-22-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 214426
DEA: 030A5704
EFIS: 0300020593
DIST-CO-RTE-PM03-YUB-20-13.3/R18.2
Award Date01/02/2020
Closeout DateNot set
Work DescriptionBrowns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location DescriptionYUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
QA Service Level1 (Verified on 10/23/2019)

Sample Information

Sample Taken Date07/14/2021 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/26/2021
Sample typeAcceptance A brief description of the samplePG 64-16 Marathon
The quantity of what the sample constitutes1 Can From where was the sample collectedSource
First name of sampler or witnessed byTravis Last name of sampler or witnessed by-
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert - Hallwood Plant Transportation Laboratory (TL) Number597105
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number6
Sublot number8 Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierMarathon Petroleum Co. LP - Elk Grove CA MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2021-07-14-22
DIME Test ID: 2021-07-14-22-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-04

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 08/01/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 156.015 grams
Mass of empty container #2: 171.225 grams
Mass of container #1 before test (m1i): 192.077 grams
Mass of container #2 before test (m2i): 207.071 grams
Mass of container #1 after test (m1f): 191.928 grams
Mass of container #2 after test (m2f): 206.963 grams
Average mass change: -0.357 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications

Test was verified on 8/4/2021