Summary for Test 2021-06-14-41-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-R18.1/R20.1 |
Award Date | 10/31/2019 |
Closeout Date | 08/03/2023 |
Work Description | Construct bridge, realign curve & widen shoulders. |
Location Description | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. |
QA Service Level | 1 (Verified on 02/27/2020) |
Sample Information
Sample Taken Date | 06/14/2021 | Sample Unique Key | 41 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/02/2021 |
Sample type | Acceptance | A brief description of the sample | PG64-16 |
The quantity of what the sample constitutes | 1 can | From where was the sample collected | Source |
First name of sampler or witnessed by | Not Provided | Last name of sampler or witnessed by | Not Provided |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Marathon | Transportation Laboratory (TL) Number | c930937 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | 1 |
Sublot number | 1 | Tank number | |
Time of sample | HMA Supplier | Teichert | |
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-14-41
DIME Test ID: 2021-06-14-41-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-07-09
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 07/06/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 175.456 grams
Mass of empty container #2: 169.871 grams
Mass of container #1 before test (m1i): 210.543 grams
Mass of container #2 before test (m2i): 204.796 grams
Mass of container #1 after test (m1f): 210.444 grams
Mass of container #2 after test (m2f): 204.663 grams
Average mass change: -0.331 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 7/9/2021 ✔