Summary for Test 2015-08-03-4-3
Test performed: CTM 521-November 2014Project Information
Project Identifiers | Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468 |
---|---|
DIST-CO-RTE-PM | 08-RIV-91,15-0.0/13.04, 35.64/45.14 |
Award Date | 09/09/2013 |
Closeout Date | Not set |
Work Description | SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas. |
Location Description | 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14 |
QA Service Level | 1 (Verified on 08/07/2014) |
Sample Information
Sample Taken Date | 08/03/2015 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/05/2015 |
Sample type | Quality Control | A brief description of the sample | 6x12 |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | JUANCHO | Last name of sampler or witnessed by | SEVILLA |
Title of sampler | CONSULTANT TECH | Telephone number of sampler | Unknown |
Laboratory sample identification | 888-SRL 71 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | JOB | Transportation Laboratory (TL) Number | SRL 71 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 91 CIP |
Structure name | BR 22 DECK |
Material Information
Material Type | Concrete | The concrete mix design number | CM5636 |
---|---|---|---|
The truck number from where the sample was collected | 299 | The batch plant ticket number from where the sample was collected | 118030782 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | LOAD 6 | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-08-03-4
DIME Test ID: 2015-08-03-4-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2015-08-17
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Measured
Tester's full name: Matthew Clayton
Date of test: 08/17/2015
Average diameter of cylinder 1: 5.98 in
Average diameter of cylinder 2: 5.98 in
Maximum load on cylinder 1: 137010 lb
Maximum load on cylinder 2: 140500 lb
Type of fracture pattern of cylinder 1: 1
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 14 days
Cross sectional area of cylinder 1: 28.09 in^2
Cross sectional area of cylinder 2: 28.09 in^2
Compressive strength of cylinder 1: 4877.5 psi
Compressive strength of cylinder 2: 5001.8 psi
Compressive strength (to nearest 10 psi): 4940 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/17/2015 ✔