Summary for Test 2021-06-23-11-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 213596 DEA: 051C8904 EFIS: 0513000009 |
---|---|
DIST-CO-RTE-PM | 05-MON-101-87.3/R91.5 |
Award Date | 12/13/2018 |
Closeout Date | 08/23/2023 |
Work Description | PRECAST CONC PVMT, CRACK AND SEAT PAVEMENT AND RECONSTRUCT RAMPS. |
Location Description | MONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD |
QA Service Level | 1 (Verified on 01/04/2019) |
Sample Information
Sample Taken Date | 06/23/2021 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/29/2021 |
Sample type | Acceptance | A brief description of the sample | PG64-10 |
The quantity of what the sample constitutes | 1 of 1 can | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | C | Last name of sampler or witnessed by | O,Connor |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refinery | Transportation Laboratory (TL) Number | c749076 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | 1 |
Sublot number | 35 | Tank number | |
Time of sample | HMA Supplier | Graniterock Aromas | |
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-23-11
DIME Test ID: 2021-06-23-11-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-07-07
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 07/01/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 171.433 grams
Mass of empty container #2: 174.687 grams
Mass of container #1 before test (m1i): 206.544 grams
Mass of container #2 before test (m2i): 210.482 grams
Mass of container #1 after test (m1f): 206.462 grams
Mass of container #2 after test (m2f): 210.398 grams
Average mass change: -0.234 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 7/7/2021 ✔