Test 2021-04-01-38-4 (AASHTO T269-14) Summary

Project Information
Project IdentifiersProject ID: 214426
DEA: 030A5704
EFIS: 0300020593
DIST-CO-RTE-PM03-YUB-20-13.3/R18.2
Work DescriptionBrowns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location DescriptionYUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
Sample Information
Sample Taken Date4/1/2021 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing4/1/2021
Sample typeVerification A brief description of the sample3/4" HMA - A w/15% RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byTeichert Personnel (SAMPLER) Last name of sampler or witnessed by Brad McKeehan (WITNESS)
Title of samplerUnknown Laboratory sample identificationJMF21-020C
The fabricator/manufacturer/facility nameTeichert - Hallwood Plant Transportation Laboratory (TL) NumberC706329
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number JMF Verification ID
Test Details
DIME Sample ID: 2021-04-01-38
DIME Test ID: 2021-04-01-38-4
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2021-06-09
Test Results

Number of tests: 3
Input Type: Calculated
Tester's full name: Jeff Herbert
Date of test: 05/11/2021
Percent Air Voids: 4.5 %
Percent Air Voids 2: 4.6
Percent Air Voids 3: 4.5
Percent Air Voids Average:4.6
General comments (publicly viewable) (Max 1000 characters): JMF21-020C.

Test was verified on 06/09/2021