Test 2021-05-27-25-9 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 215236
DEA: 081C6804
EFIS: 0812000343
DIST-CO-RTE-PM08-RIV-74,79and371-Varies
Work DescriptionREPLACE STRUCTURAL CONCRETE BRIDGE, RETAINING WALL AND BOX CULVERT.
Location DescriptionRIVERSIDE COUNTY AT VARIOUS LOCATIONS
Sample Information
Sample Taken Date5/27/2021 Sample Unique Key25
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/2/2021
Sample typeVerification A brief description of the sampleJMF 1/2" HMA-A-SP R25 0.5% LAS
The quantity of what the sample constitutes6 Bags Coldfeed Aggregate 3 Bags RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byCalifornia Commercial Asphalt Lake Elsinore Last name of sampler or witnessed byQC
Title of sampler Laboratory sample identification0321A-21
The fabricator/manufacturer/facility nameCalifornia Commercial Asphalt - Lake Elsinore Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-33-0098, 91-33-0011
The fabricator's/manufacturer's product name for the sample1/2 HMA-A-SP R25 The fabricator/manufacturer designation for the sample
The plant number51217615 A detailed description of where the material sample was collectedBelt Cut at California Commercial Asphalt Lake Elsinore Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number JMF Verification ID
Test Details
DIME Sample ID: 2021-05-27-25
DIME Test ID: 2021-05-27-25-9
Testing Lab: CT - Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-06-09
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Friday Ofoegbu
Date of test: 06/07/2021
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:95 %
Cumulative percent passing the 3/8 in. sieve:83 %
Cumulative percent passing the #4 sieve:59 %
Cumulative percent passing the #8 sieve:44 %
Cumulative percent passing the #16 sieve:34 %
Cumulative percent passing the #30 sieve:26 %
Cumulative percent passing the #50 sieve:18 %
Cumulative percent passing the #100 sieve:12 %
Cumulative percent passing the #200 sieve:8 %
General comments (publicly viewable) (Max 1000 characters): Rap Gradation After Ignition