Test 2021-04-01-33-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 215062
DEA: 030F2904
EFIS: 0314000101
DIST-CO-RTE-PM03-BUT-99-14.9/15.7
Work DescriptionCONSTRUCT BRIDGE AND ROADWAY; & REMOVE BRIDGE.
Location DescriptionBUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF NELSON AVENUE
Sample Information
Sample Taken Date4/1/2021 Sample Unique Key33
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing4/1/2021
Sample typeVerification A brief description of the sample3/4" HMA - A w/RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byTeichert Personnel (SAMPLER) Last name of sampler or witnessed by Brad McKeehan (WITNESS)
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameTeichert - Hallwood Plant Transportation Laboratory (TL) NumberC706327
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number JMF Verification ID JMF3513-2021-55
Test Details
DIME Sample ID: 2021-04-01-33
DIME Test ID: 2021-04-01-33-1
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-06-02
Test Results

Input Type: Calculated
Tester's full name: Benjamin Dreher
Date of test: 05/11/2021
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:4.78 %
General comments (publicly viewable) (Max 1000 characters): JMF21-020B.

Test was verified on 06/02/2021