Test 2021-06-01-6-2 (AASHTO T301-13) Summary

Project Information
Project IdentifiersProject ID: 55556
DEA: OCR
EFIS: OCR
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Oregon Corp. Research.
Location DescriptionNot set
Sample Information
Sample Taken Date6/1/2021 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing6/1/2021
Sample typeProficiency A brief description of the sampleasphalt binder
The quantity of what the sample constitutes1 Can From where was the sample collectedManufacturer
First name of sampler or witnessed byOREGON COOP Last name of sampler or witnessed byOREGON COOP
Title of sampler Laboratory sample identificationSample 314
The fabricator/manufacturer/facility nameErgon Asphalt and Emulsions Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-28
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Asphalt Binder SupplierOregon Corp - Salem OR MultigradeNo
Multigrade TypeNot set HMA Design ID
Test Details
DIME Sample ID: 2021-06-01-6
DIME Test ID: 2021-06-01-6-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-06-07
Test Results

Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 06/02/2021
Final Reading from the testing machine (X): 5 cm
% Elongation Recovery: 75 %
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs

Test was verified on 06/07/2021