Summary for Test 2021-04-28-10-2

Test performed: AASHTO T301-13

Project Information

Project IdentifiersProject ID: 55556
DEA: OCR
EFIS: OCR
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for Oregon Corp. Research.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date04/28/2021 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/05/2021
Sample typeProficiency A brief description of the samplePG58V-22
The quantity of what the sample constitutes1 of 1 can From where was the sample collectedSource
First name of sampler or witnessed byN/A Last name of sampler or witnessed byN/A
Title of sampler Telephone number of sampler
Laboratory sample identification313 Linked DIME Sample ID
The fabricator/manufacturer/facility nameMcCall Terminals Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 70-22
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierOregon Corp - Salem OR MultigradeNo
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2021-04-28-10
DIME Test ID: 2021-04-28-10-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2021-05-11

Test Results


Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 05/10/2021
Final Reading from the testing machine (X): 6 cm
% Elongation Recovery: 70 %
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs

Test was verified on 5/11/2021