Summary for Test 2021-03-29-13-10

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214850
DEA: 081K1404
EFIS: 0818000200
DIST-CO-RTE-PM08-RIV-10-R139.0/R155.0
Award Date05/08/2020
Closeout Date11/09/2021
Work DescriptionSTRUCTURE CONCRETE, FURNISH AND PLACE POLYESTER CONCRETE.
Location DescriptionRIVERSIDE COUNTY IN AND NEAR BLYTHE FROM ISORA DITCH TO ROUTE 10/95 SEPARATION
QA Service Level1 (Verified on 08/18/2020)

Sample Information

Sample Taken Date03/29/2021 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/06/2021
Sample typeVerification A brief description of the sampleJMF 1/2" HMA-A-SP R15 0.5% LAS
The quantity of what the sample constitutes8 Bags of Aggregate, 2 Bags of RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byChris Last name of sampler or witnessed byLawless
Title of sampler Telephone number of sampler
Laboratory sample identification0194A-21 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalifornia Commercial Asphalt - Coachella Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0084
The fabricator's/manufacturer's product name for the sample1/2 HMA-A-SP R15 The fabricator/manufacturer designation for the sample
The plant number41217333 A detailed description of where the material sample was collectedBelt Cut at California Commercial Asphalt Coachella Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-03-29-13
DIME Test ID: 2021-03-29-13-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-04-28

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Friday Ofoegbu, Nader Rashidi
Date of test: 04/16/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 82 %
Cumulative percent passing the #4 sieve: 57 %
Cumulative percent passing the #8 sieve: 45 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 20 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 4 %
General comments (publicly viewable) (Max 1000 characters): Combined RAP/Virgin Aggregate Gradation W/Correlation Factors Applied

Test was verified on 4/28/2021