Summary for Test 2021-04-12-18-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 214579
DEA: 010B0904
EFIS: 0100020444
DIST-CO-RTE-PM01-DN-101-8.2/8.7
Award Date04/21/2020
Closeout DateNot set
Work DescriptionPanther Creek & Hunter Creek Bridges
Location DescriptionDEL NORTE COUNTY NEAR KLAMATH AT PANTHER CREEK BRIDGE AND AT HUNTER CREEK BRIDGE
QA Service Level1 (Verified on 03/02/2020)

Sample Information

Sample Taken Date04/12/2021 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/14/2021
Sample typeQuality Assurance A brief description of the samplebearing pad
The quantity of what the sample constitutes1 From where was the sample collectedManufacturer
First name of sampler or witnessed byMike Last name of sampler or witnessed bySpellman
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameDS Brown Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)4001520-1A
Material/Compound/Elastomer IDna Samples Representing13
Description (size)2.3"x12"x12" Comments
Description (Number of Shims)4 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)DS Brown
Batch Numberna

Test Details

DIME Sample ID: 2021-04-12-18
DIME Test ID: 2021-04-12-18-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-04-20

Test Results


Input Type: Measured
Tester's full name: Richard Wilmshurst
Date of test: 04/20/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/20/2021