Summary for Test 2021-04-11-1-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 213406 DEA: 030F2504 EFIS: 0300000075 |
---|---|
DIST-CO-RTE-PM | 03-YOL,SAC-80-R11.1/R11.7,M0.0/M0.5 |
Award Date | 08/21/2020 |
Closeout Date | 07/31/2023 |
Work Description | SAC RIVER BOH (BRYTE BEND) |
Location Description | SACRAMENTO AND YOLO COUNTIES IN WEST SACRAMENTO AND SACRAMENTO FROM 0.1 MILE WEST OF REED AVENUE UNDERCROSSING TO 0.1 MILE EAST OF SACRAMENTO RIVER BRIDGE AND OVERHEAD |
QA Service Level | 1 (Verified on 06/07/2018) |
Sample Information
Sample Taken Date | 04/11/2021 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/12/2021 |
Sample type | Acceptance | A brief description of the sample | Asphalt Binder |
The quantity of what the sample constitutes | 1 of 1 can | From where was the sample collected | Other |
First name of sampler or witnessed by | Sam | Last name of sampler or witnessed by | Mosallem |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Western | Transportation Laboratory (TL) Number | c783777 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Teichert Perkins 1111 | |
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-04-11-1
DIME Test ID: 2021-04-11-1-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-04-16
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 04/13/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.714 grams
Mass of empty container #2: 175.504 grams
Mass of container #1 before test (m1i): 209.474 grams
Mass of container #2 before test (m2i): 211.422 grams
Mass of container #1 after test (m1f): 209.347 grams
Mass of container #2 after test (m2f): 211.292 grams
Average mass change: -0.359 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 4/16/2021 ✔