Test 2020-11-14-8-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 213411
DEA: 030H10U4
EFIS: 0317000246
DIST-CO-RTE-PM03-SAC-5-9.7/24.9
Work DescriptionNot set
Location DescriptionConstruction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct
Sample Information
Sample Taken Date11/14/2020 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing1/7/2021
Sample typeVerification A brief description of the sample3/4" Type A - HMA, LL Rich Bottom
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byJ. Buscheck (WITNESS) Last name of sampler or witnessed byTeichert Personnel (SAMPLER)
Title of sampler Laboratory sample identificationJMF21-004
The fabricator/manufacturer/facility nameTeichert Perkins - Continuous Plant Dreyer Drum Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number JMF Verification ID JMF3513-2021-35
Test Details
DIME Sample ID: 2020-11-14-8
DIME Test ID: 2020-11-14-8-1
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2021-03-29
Test Results

Input Type: Calculated
Tester's full name: Benjamin Dreher
Date of test: 03/08/2021
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:5.70 %
General comments (publicly viewable) (Max 1000 characters): JMF21-004.

Test was verified on 03/29/2021