Test 2021-02-22-14-5 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 66666
DEA: APP
EFIS: 0019000052
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
Sample Information
Sample Taken Date2/22/2021 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing2/22/2021
Sample typeAggregate Prequalification Program A brief description of the sampleCon Sand
The quantity of what the sample constitutes 3 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byCody Last name of sampler or witnessed byBrown
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameSyar Healdsburg Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-49-0004
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCanyon Rock
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design number Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-02-22-14
DIME Test ID: 2021-02-22-14-5
Testing Lab: Syar Industries, Inc.
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-02-25
Test Results

What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Cody Brown
Date of test: 02/22/2021
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:98 %
Cumulative percent passing the #8 sieve:81 %
Cumulative percent passing the #16 sieve:50 %
Cumulative percent passing the #30 sieve:31 %
Cumulative percent passing the #50 sieve:18 %
Cumulative percent passing the #100 sieve:9 %
Cumulative percent passing the #200 sieve:4.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 02/25/2021