Test 2021-01-12-23-2 (AASHTO T269-14) Summary

The test has been saved successfully.
Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date1/12/2021 Sample Unique Key23
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing1/12/2021
Sample typePreliminary A brief description of the sample1/2" HMA-SP WMA
The quantity of what the sample constitutes780 pounds From where was the sample collectedManufacturer
First name of sampler or witnessed byCody Last name of sampler or witnessed byBrown
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameSyar Todd Road Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2021-01-12-23
DIME Test ID: 2021-01-12-23-2
Testing Lab: Syar Industries, Inc.
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2021-02-19
Test Results

Number of tests: 3
Input Type: Calculated
Tester's full name: Cody Brown
Date of test: 01/12/2021
Percent Air Voids: 4 %
Percent Air Voids 2: 4 %
Percent Air Voids 3: 4 %
Percent Air Voids Average:4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 02/19/2021