Summary for Test 2021-01-22-1-5

Test performed: ASTM C1038-14b

Project Information

Project IdentifiersProject ID: 213596
DEA: 051C8904
EFIS: 0513000009
DIST-CO-RTE-PM05-MON-101-87.3/R91.5
Award Date12/13/2018
Closeout Date08/23/2023
Work DescriptionPRECAST CONC PVMT, CRACK AND SEAT PAVEMENT AND RECONSTRUCT RAMPS.
Location DescriptionMONTEREY COUNTY IN SALINAS FROM EAST MARKET STREET UNDERCROSSING TO 0.3 MILE SOUTH OF ESPINOSA ROAD
QA Service Level1 (Verified on 01/04/2019)

Sample Information

Sample Taken Date01/22/2021 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/22/2021
Sample typeQuality Assurance A brief description of the sampleRapid Setting Cement
The quantity of what the sample constitutes1 Bucket From where was the sample collectedSupplier
First name of sampler or witnessed byna Last name of sampler or witnessed byna
Title of sampler Telephone number of sampler
Laboratory sample identificationCM214101 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTS Rapid Set Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeCementitious BrandCTS
MillJuarez Type of Cementitious MaterialRapid Set Cement

Test Details

DIME Sample ID: 2021-01-22-1
DIME Test ID: 2021-01-22-1-5
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C1038-14b: Standard Test Method for Expansion of Hydraulic Cement Mortar Bars Stored in Water (Cement Mortar Bars)
Test Release Date: 2021-02-09

Test Results


Input Type: Measured
Tester's full name: Benjamin Lenz
Date of test: 02/09/2021
Specimen A Initial measurement at 24 hours: 0.2817 in
Specimen B Initial measurement at 24 hours: 0.2749 in
Specimen C Initial measurement at 24 hours: 0.2889 in
Specimen D Initial measurement at 24 hours: 0.2718 in
Specimen A Final measurement at 14 days: 0.2823 in
Specimen B Final measurement at 14 days: 0.2756 in
Specimen C Final measurement at 14 days: 0.2897 in
Specimen D Final measurement at 14 days: 0.2725 in
The average length of change of the four specimens: 0.007 %
General comments (publicly viewable) (Max 1000 characters): @ 11:45

Test was verified on 2/9/2021