Test 2020-01-17-15-1 (AASHTO T27-14) Summary

Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date1/17/2020 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing1/17/2020
Sample typeQuality Control A brief description of the sampleBin 2 sample pull, initial design
The quantity of what the sample constitutesMultiple Bags, ~40 lbs From where was the sample collectedSource
First name of sampler or witnessed byDaniel Last name of sampler or witnessed byMiltz
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameSalinas Asphalt Facility Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-27-0028
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedPulled from Bin 2 drop
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number HMA Design ID JMF3512-2021-32-20_1580
Test Details
DIME Sample ID: 2020-01-17-15
DIME Test ID: 2020-01-17-15-1
Testing Lab: Granite Construction - Coastal
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2021-02-11
Test Results

What type of gradation is being tested?: Combined Gradation
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Input Type: Calculated
Tester's full name: Ryan Gibbs
Date of test: 01/17/2020
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:100 %
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:79 %
Cumulative percent passing the #8 sieve:12 %
Cumulative percent passing the #16 sieve:2 %
Cumulative percent passing the #30 sieve:1 %
Cumulative percent passing the #50 sieve:1 %
Cumulative percent passing the #100 sieve:1 %
Cumulative percent passing the #200 sieve:0.5 %
General comments (publicly viewable) (Max 1000 characters): Average of multiple bin 2 samples taken over the course of design work to set mix targets

Test was verified on 02/11/2021