Summary for Test 2021-01-20-10-2
Test performed: AASHTO T51-13Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
Sample Taken Date | 01/20/2021 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/27/2021 |
Sample type | Acceptance | A brief description of the sample | asphalt binder PG64-10 |
The quantity of what the sample constitutes | 1 Can, JMF verification | From where was the sample collected | Source |
First name of sampler or witnessed by | Calportland | Last name of sampler or witnessed by | Calportland |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | 210120B |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Not set | |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-01-20-10
DIME Test ID: 2021-01-20-10-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2021-02-03
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: Three
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 02/01/2021
Ductility of test #1 (D1): 135 cm
Ductility of test #2 (D2): 130 cm
Ductility of test #3 (D3): 150 cm
Ductility of sample: 138 cm
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specifications
Test was verified on 2/3/2021 ✔