Test 2019-03-21-15-1 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date3/21/2019 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing3/21/2019
Sample typeQuality Control A brief description of the sampleRAP
The quantity of what the sample constitutesJMF4 bags From where was the sample collectedManufacturer
First name of sampler or witnessed byTBD Last name of sampler or witnessed byTBD
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameGranite Felton, Lexington Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeReclaimed Asphalt Pavement RAP SourceGranite Felton
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
HMA Design ID JMF3512-2021-18-1230
Test Details
DIME Sample ID: 2019-03-21-15
DIME Test ID: 2019-03-21-15-1
Testing Lab: Granite Construction - Coastal
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-01-29
Test Results

What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Victor Ramirez
Date of test: 03/21/2019
Cumulative percent passing the 3 in. sieve:100 %
Cumulative percent passing the 2 1/2 in. sieve:100 %
Cumulative percent passing the 2 in. sieve:100 %
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:100 %
Cumulative percent passing the 1/2 in. sieve:100 %
Cumulative percent passing the 3/8 in. sieve:100 %
Cumulative percent passing the #4 sieve:79 %
Cumulative percent passing the #8 sieve:57 %
Cumulative percent passing the #16 sieve:43 %
Cumulative percent passing the #30 sieve:32 %
Cumulative percent passing the #50 sieve:24 %
Cumulative percent passing the #100 sieve:17 %
Cumulative percent passing the #200 sieve:11.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 01/29/2021