Summary for Test 2015-04-23-3-1
Test performed: CTM 521-November 2014Project Information
Project Identifiers | Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468 |
---|---|
DIST-CO-RTE-PM | 08-RIV-91,15-0.0/13.04, 35.64/45.14 |
Award Date | 09/09/2013 |
Closeout Date | 09/20/2023 |
Work Description | SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas. |
Location Description | 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14 |
QA Service Level | 1 (Verified on 08/07/2014) |
Sample Information
Sample Taken Date | 04/23/2015 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/24/2015 |
Sample type | Verification | A brief description of the sample | 6X12 |
The quantity of what the sample constitutes | 7 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | K | Last name of sampler or witnessed by | TALATI |
Title of sampler | T E | Telephone number of sampler | Unknown |
Laboratory sample identification | 888-SRL43 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Collected at jobsite | Transportation Laboratory (TL) Number | SRL 43 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | BR 28 ABUT 5 |
Material Information
Material Type | Concrete | The concrete mix design number | CM4261 |
---|---|---|---|
The truck number from where the sample was collected | 286 | The batch plant ticket number from where the sample was collected | 118022984 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | from mix truck | Where the material sample would have been placed if not sampled | Not set |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-04-23-3
DIME Test ID: 2015-04-23-3-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2015-05-21
Test Results
Unit system used?: US Units
Number of specimens: 5
Test performed: With no density determined
Input Type: Measured
Tester's full name: Matthew Clayton
Date of test: 04/24/2015
Average diameter of cylinder 1: 5.97 in
Average diameter of cylinder 2: 5.97 in
Average diameter of cylinder 3: 5.97 in
Average diameter of cylinder 4: 5.97 in
Average diameter of cylinder 5: 5.97 in
Maximum load on cylinder 1: 127260 lb
Maximum load on cylinder 2: 127530 lb
Maximum load on cylinder 3: 130780 lb
Maximum load on cylinder 4: 129960 lb
Maximum load on cylinder 5: 126540 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 3
Type of fracture pattern of cylinder 4: 3
Type of fracture pattern of cylinder 5: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 1 days
Cross sectional area of cylinder 1: 27.99 in^2
Cross sectional area of cylinder 2: 27.99 in^2
Cross sectional area of cylinder 3: 27.99 in^2
Cross sectional area of cylinder 4: 27.99 in^2
Cross sectional area of cylinder 5: 27.99 in^2
Compressive strength of cylinder 1: 4546.6 psi
Compressive strength of cylinder 2: 4556.3 psi
Compressive strength of cylinder 3: 4672.4 psi
Compressive strength of cylinder 4: 4643.1 psi
Compressive strength of cylinder 5: 4520.9 psi
Compressive strength (to nearest 10 psi): 4590 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/21/2015 ✔