Test 2020-11-24-27-10 (AASHTO T27-14) Summary

Project Information
Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
Sample Information
Sample Taken Date11/24/2020 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/30/2020
Sample typeVerification A brief description of the sample3/4" Aggregate for JMF Verification
The quantity of what the sample constitutes2 bags RAP 1 bag mineral filler 3 bags for each bin 1-4 From where was the sample collectedSource
First name of sampler or witnessed byDonald Last name of sampler or witnessed byZuniga
Title of samplerTET Laboratory sample identification20-JMFPP-0228
The fabricator/manufacturer/facility nameSyar Industries Transportation Laboratory (TL) Number911412
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-48-0002
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sampleBatch plant bins
The plant number A detailed description of where the material sample was collectedCold feeds
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number JMF Verification ID JMF3513-2020-223
Test Details
DIME Sample ID: 2020-11-24-27
DIME Test ID: 2020-11-24-27-10
Testing Lab: CT D01 - Field Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2021-01-08
Test Results

What type of gradation is being tested?: HMA Gradation
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 01/06/2021
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:100 %
Cumulative percent passing the 3/4 in. sieve:98 %
Cumulative percent passing the 1/2 in. sieve:79 %
Cumulative percent passing the 3/8 in. sieve:69 %
Cumulative percent passing the #4 sieve:47 %
Cumulative percent passing the #8 sieve:32 %
Cumulative percent passing the #16 sieve:20 %
Cumulative percent passing the #30 sieve:15 %
Cumulative percent passing the #50 sieve:10 %
Cumulative percent passing the #100 sieve:7 %
Cumulative percent passing the #200 sieve:5 %
General comments (publicly viewable) (Max 1000 characters): Combined Gradation from 4 bins. Bin 1 @ 30%, Bin 2 @ 18%, Bin 3 @ 18% and Bin 4 @ 17%. And 2% Mineral Filler

Test was verified on 01/08/2021