Project Information

Project ID: 214909 DEA: 120N8604 EFIS: 1214000123 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-73-23.7/24.1
Work Description: REPLACE STRUCTURAL CONCRETE BRIDGE & RETAINING WALL; & PLACE HMA.
Location Description: ORANGE COUNTY IN NEWPORT BEACH FROM 0.3 MILE NORTH OF BISON AVENUE TO 0.3 MILE SOUTH OF UNIVERSITY DRIVE
Contractor Name: BEADOR CONSTRUCTION COMPANY, INC.
Contractor Address: 26320 LESTER CIRCLE, CORONA CA 92883
Resident Engineer: Jay Joubeen Structure Rep.: Ali Jenabzadeh

Sample Information

DIME Sample ID: 2020-10-14-8
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 10/14/2020
Date that the sample was received by the laboratory/organization performing the testing: 10/20/2020
The quantity of what the sample constitutes: 2 lots total 300 hoops
A brief description of the sample: #6 rebar hoops, 4'-2" diameter
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Etiwanda

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4099734
Hoop Manufacturer Lot Number(s): Lot 1 and 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 4'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Steel AZ
Welding Company: CMC Rebar (Etiwanda)
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 6

DIME Test ID: 2020-10-14-8-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
116/19mm0.4442510.1896614Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 2 of 6

DIME Test ID: 2020-10-14-8-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
216/19mm0.4442593.0896802Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 3 of 6

DIME Test ID: 2020-10-14-8-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
316/19mm0.4442596.5796810Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 4 of 6

DIME Test ID: 2020-10-14-8-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
126/19mm0.4442290.0896114Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 5 of 6

DIME Test ID: 2020-10-14-8-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
226/19mm0.4442593.0696802Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 6 of 6

DIME Test ID: 2020-10-14-8-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 10/21/2020
Date Tested: 10/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
326/19mm0.4442627.2996880Ok Neckingbewing
UTM 400kip
Temperature 72 f