DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 041G4304 Cty NAP Rte 128 PM R7.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Paramdeep Brar |
Date Reported: |
09/14/2020 |
|
Address: |
TL Number: |
28 - Napa |
||
City: |
||||
Project Name: REPLACE BRIDGE, HMA PAVING, DRAINAGE AND RSP |
||||
Prime Contractor: GHILOTTI CONSTRUCTION CO. INC. |
||||
Sample Taken Date: |
08/17/2020 |
Mix Design: |
CT2 |
|
Contractor: Unknown |
Location: NAPA COUNTY NEAR SAINT HELENA AT CONN CREEK |
|||
Structure unique identifier: 21-0115 |
||||
Structure name: Conn Creek Bridge Pier 2 Precast Column to CIDH Pile Stage 2 |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.46 | 125686 | 4416.0 | 1 |
2 | 6.01 | 28.37 | 123292 | 4346.0 | 1 |
DIME Test ID: 2020-08-17-16-2
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4380
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing