Print Report | Back to Test Summary

Testing Report for 2018-09-13-13-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

DEA: 021H5804
EFIS: 0216000024
Project ID: 212779
QA Service Level: 1
DIST-CO-RTE-PM: 02-PLU-70-58.4/R78.4
Work Description:
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown
Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2018-09-13-13
TL Number from the TL Form:
Sample Submitted By Organization: CT D02 - North Region Materials Lab
Sample Organization Contact: (530) 225-3194
Type of Sample: Informational
Type of Material: Soil
Sample Taken Date: 9/13/2018
Date that the sample was received by the laboratory/organization performing the testing: 9/14/2018
The quantity of what the sample constitutes: not provided
A brief description of the sample: Sand, Silt, Clay, Rock
From where was the sample collected: Job Site
Laboratory sample identification: D77642
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Not applicable

Material Information

The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Plu 70 PM R78.2
Where the material sample would have been placed if not sampled:

Test Information

DIME Test ID: 2018-09-13-13-1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Date Tested: 9/26/2018
Verified Date: 8/18/2020
Submitted By Organization: CT D02 - North Region Materials Lab
Organization Address: 1657 Riverside Dr,MS-83
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: (530) 225-3194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 99 %
Cumulative percent passing the 1/2 in. sieve: 99 %
Cumulative percent passing the 3/8 in. sieve: 99 %
Cumulative percent passing the #4 sieve: 99 %
Cumulative percent passing the #8 sieve: 97 %
Cumulative percent passing the #16 sieve: 92 %
Cumulative percent passing the #30 sieve: 86 %
Cumulative percent passing the #50 sieve: 78 %
Cumulative percent passing the #100 sieve: 67 %
Cumulative percent passing the #200 sieve: 56 %