Print Report | Back to Test Summary

Testing Report for 2020-04-23-14-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214432 DEA: 080R1504 EFIS: 0812000025 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-40-R75.0/R100.0
Work Description: REGRADE MEDIAN CROSS SLOPES.
Location Description: SAN BERNARDINO COUNTY FROM 3.2 MILES WEST OF KELBAKER ROAD UNDERCROSSING TO ESSEX ROAD OVERCROSSING
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Darcy Davis Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2020-04-23-14
TL Number from the TL Form: NA
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Acceptance
Type of Material: Soil
Sample Taken Date: 04/23/2020
Date that the sample was received by the laboratory/organization performing the testing: 04/24/2020
The quantity of what the sample constitutes: 2 bags
A brief description of the sample: soil - sample - native I40 Median
From where was the sample collected: Source
Laboratory sample identification: 9891
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Native

Material Information

The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: I40 MEDIAN STOCKPILE BORROW PIT 9 PM 83
Where the material sample would have been placed if not sampled: Unknown

Test Information

DIME Test ID: 2020-04-23-14-1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 05/13/2020
Date Tested: 04/29/2020
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Cumulative percent passing the 3 in. sieve 100 %
Cumulative percent passing the 2 1/2 in. sieve 100 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 99 %
Cumulative percent passing the 1 in. sieve 98 %
Cumulative percent passing the 3/4 in. sieve 97 %
Cumulative percent passing the 1/2 in. sieve 96 %
Cumulative percent passing the 3/8 in. sieve 95 %
Cumulative percent passing the #4 sieve 90 %
Cumulative percent passing the #8 sieve 71 %
Cumulative percent passing the #16 sieve 51 %
Cumulative percent passing the #30 sieve 33 %
Cumulative percent passing the #50 sieve 20 %
Cumulative percent passing the #100 sieve 12 %
Cumulative percent passing the #200 sieve 8.1 %