Print Report | Back to Sample Detail

Sample Record for 2020-04-27-6

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-10-0.0/13.2
Work Description: Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location Description: LA/SBD County Line to PM 13.2 near I-15
Contractor Name: Lane-Security Paving Joint Venture
Contractor Address: 3450 Centre Lake Drive, 1st Floor, Ontario, CA 91761
Resident Engineer: Jose Corona Structure Rep.: Luis Negrete

Sample Information

DIME Sample ID: 2020-04-27-6
TL Number from the TL Form:
Sample Submitted By Organization: CT METS QASI - Los Angeles Design Build Field Laboratory
Sample Organization Contact: (619) 204-7248
Type of Sample: Quality Control
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 04/27/2020
Date that the sample was received by the laboratory/organization performing the testing: 04/30/2020
The quantity of what the sample constitutes: 304
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Etiwanda

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4094915
Hoop Manufacturer Lot Number(s): Lot 1, 2, 3
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #5
Diameter of Hoop: 2'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Rebar
Welding Company: CMC Rebar (Etiwanda)
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 6

DIME Test ID: 2020-04-27-6-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
125/16mm0.3129751.2895972OK Neckingfsaylor
UTM 400kip
Temperature 72 f

Test 2 of 6

DIME Test ID: 2020-04-27-6-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
225/16mm0.3129777.9296058OK Neckingfsaylor
UTM 400kip
Temperature 72 f

Test 3 of 6

DIME Test ID: 2020-04-27-6-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
325/16mm0.3129726.3595891OK Neckingfsaylor
UTM 400kip
Temperature 72 f

Test 4 of 6

DIME Test ID: 2020-04-27-6-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
135/16mm0.3129727.9695897OK Neckingfsaylor
UTM 400kip
Temperature 72 f

Test 5 of 6

DIME Test ID: 2020-04-27-6-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
235/16mm0.3129654.3895659OK Neckingfsaylor
UTM 400kip
Temperature 72 f

Test 6 of 6

DIME Test ID: 2020-04-27-6-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 05/01/2020
Date Tested: 04/30/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
335/16mm0.3129735.5095921OK Neckingfsaylor
UTM 400kip
Temperature 72 f