Print Report | Back to Test Summary

Testing Report for 2019-11-06-24-2

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214664 DEA: 081G7404 EFIS: 0816000060 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-15-R110.0
Work Description: RECONSTRUCT EARTHEN DIKE, PLACE STRUC. STEEL BRIDGE & TORTOISE FENCE.
Location Description: BETWEEN BARSTOW AND BAKER AT 1.6 MILES SOUTH OF AFTON ROAD OVERCROSSING
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-11-06-24
TL Number from the TL Form: C639959
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 11/06/2019
Date that the sample was received by the laboratory/organization performing the testing: 11/07/2019
The quantity of what the sample constitutes: 2 BAGS
A brief description of the sample: SOIL
From where was the sample collected: Job Site
Laboratory sample identification: 8816
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: NATIVE

Material Information

The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: 08-SBD-15-PM110 SURFACE
Where the material sample would have been placed if not sampled: Unknown

Test Information

DIME Test ID: 2019-11-06-24-1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 03/12/2020
Date Tested: 11/13/2019
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Cumulative percent passing the 3 in. sieve 100 %
Cumulative percent passing the 2 1/2 in. sieve 100 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 99 %
Cumulative percent passing the 3/4 in. sieve 97 %
Cumulative percent passing the 1/2 in. sieve 86 %
Cumulative percent passing the 3/8 in. sieve 93 %
Cumulative percent passing the #4 sieve 83 %
Cumulative percent passing the #8 sieve 77 %
Cumulative percent passing the #16 sieve 71 %
Cumulative percent passing the #30 sieve 61 %
Cumulative percent passing the #50 sieve 39 %
Cumulative percent passing the #100 sieve 17 %
Cumulative percent passing the #200 sieve 7.5 %
Cumulative Percent Passing on 1 Micron 3 %
Cumulative Percent Passing on 5 Microns 6 %