Testing Report for 2019-10-21-16-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-215-2.7
Work Description: REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA.
Location Description: SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Roberto Castro Structure Rep.: Sylvia Stracner

Sample Information

DIME Sample ID: 2019-10-21-16
TL Number from the TL Form: SB 215
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Preliminary
Type of Material: Soil
Sample Taken Date: 10/21/2019
Date that the sample was received by the laboratory/organization performing the testing: 10/22/2019
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: 5' NATIVE SOIL
From where was the sample collected: Job Site
Laboratory sample identification: 8768
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Native soil

Material Information

The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: Jobsite
Where the material sample would have been placed if not sampled: Unknown

Test Information

DIME Test ID: 2019-10-21-16-1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 03/10/2020
Date Tested: 10/21/2019
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified :

Submitted Test Results

Cumulative percent passing the 3 in. sieve 100 %
Cumulative percent passing the 2 1/2 in. sieve 100 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 99 %
Cumulative percent passing the 3/4 in. sieve 99 %
Cumulative percent passing the 1/2 in. sieve 99 %
Cumulative percent passing the 3/8 in. sieve 99 %
Cumulative percent passing the #4 sieve 97 %
Cumulative percent passing the #8 sieve 91 %
Cumulative percent passing the #16 sieve 83 %
Cumulative percent passing the #30 sieve 74 %
Cumulative percent passing the #50 sieve 61 %
Cumulative percent passing the #100 sieve 46 %
Cumulative percent passing the #200 sieve 32 %