Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 041G4304 Cty NAP Rte 128 PM R7.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Paramdeep Brar |
Date Reported: |
02/06/2020 |
|
Address: |
TL Number: |
28 - Napa |
||
City: |
||||
Project Name: REPLACE BRIDGE, HMA PAVING, DRAINAGE AND RSP |
||||
Prime Contractor: GHILOTTI CONSTRUCTION CO. INC. |
||||
Sample Taken Date: |
01/30/2020 |
Mix Design: |
CT1 15 |
|
Contractor: Unknown |
Location: NAPA COUNTY NEAR SAINT HELENA AT CONN CREEK |
|||
Structure unique identifier: 21-0115 |
||||
Structure name: Conn Creek Bridge Approach Slab |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 27.98 | 5.97 | 4768.1 | 133411 | 1 |
2 | 28.17 | 5.99 | 4235.0 | 119301 | 1 |
DIME Test ID: 2020-01-30-20-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4500
Age of specimen: 7 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing