Print Report | Back to Sample Detail

Sample Record for 2019-04-17-9

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 209695 DEA: 08347704 EFIS: 0800000616 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-SR-58-0/12.9
Work Description: (Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location Description: SR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Contractor Name: KIEWIT INFRASTRUCTURE WEST CO.
Contractor Address: 2215 E 1ST STREET, VANCOUVER, WA 98661
Resident Engineer: Shaine Shahidi Structure Rep.: Osama Abdalla

Sample Information

DIME Sample ID: 2019-04-17-9
TL Number from the TL Form: 20190417
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 04/17/2019
Date that the sample was received by the laboratory/organization performing the testing: 04/18/2019
The quantity of what the sample constitutes: 6
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 976-0417
Structure unique identifier: frame 2 right deck
Structure name: frame 2 right deck
The fabricator/manufacturer/facility name: Robertsons LUCERNE

Material Information

The concrete mix design number: RRM17052
The truck number from where the sample was collected: 1196
The batch plant ticket number from where the sample was collected: 4096840
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: KIEWITT
A detailed description of where the material sample was collected: 345 cy
Where the material sample would have been placed if not sampled: frame 2 right deck
From Lot No.: Unknown
Bag Lot No.: Unknown

Test Results

Test 1 of 3

DIME Test ID: 2019-04-17-9-1
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Verified Date: 04/26/2019
Date Tested: 04/26/2019
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Cross sectional area of cylinder 1 28.37 in^2
Cross sectional area of cylinder 2 28.37 in^2
Capped in accordance with? ASTM C617/CTM521
Compressive strength (to nearest 10 psi) 5080 psi
Average diameter of cylinder 1 6.01 in
Average diameter of cylinder 2 6.01 in
Compressive strength of cylinder 1 5127.6 psi
Compressive strength of cylinder 2 5035.6 psi
Maximum load on cylinder 1 145470 lb
Maximum load on cylinder 2 142860 lb
Type of fracture pattern of cylinder 1 1
Type of fracture pattern of cylinder 2 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 9 days

Test 2 of 3

DIME Test ID: 2019-04-17-9-2
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Verified Date: 04/30/2019
Date Tested: 04/29/2019
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Cross sectional area of cylinder 1 28.46 in^2
Cross sectional area of cylinder 2 28.46 in^2
Capped in accordance with? ASTM C617/CTM521
Compressive strength (to nearest 10 psi) 5210 psi
Average diameter of cylinder 1 6.02 in
Average diameter of cylinder 2 6.02 in
Compressive strength of cylinder 1 5126.1 psi
Compressive strength of cylinder 2 5299.4 psi
Maximum load on cylinder 1 145890 lb
Maximum load on cylinder 2 150820 lb
Type of fracture pattern of cylinder 1 1
Type of fracture pattern of cylinder 2 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 12 days

Test 3 of 3

DIME Test ID: 2019-04-17-9-3
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Verified Date: 05/15/2019
Date Tested: 05/15/2019
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed With no density determined
Cross sectional area of cylinder 1 28.37 in^2
Cross sectional area of cylinder 2 28.37 in^2
Capped in accordance with? ASTM C617/CTM521
Compressive strength (to nearest 10 psi) 6000 psi
Average diameter of cylinder 1 6.01 in
Average diameter of cylinder 2 6.01 in
Compressive strength of cylinder 1 6103.6 psi
Compressive strength of cylinder 2 5902.0 psi
Maximum load on cylinder 1 173160 lb
Maximum load on cylinder 2 167440 lb
Type of fracture pattern of cylinder 1 1
Type of fracture pattern of cylinder 2 1
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Age of specimen 28 days