Print Report | Back to Sample Detail

Sample Record for 2019-01-24-21

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-01-24-21
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 01/24/2019
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 1
A brief description of the sample: 3/4 Inch HMA-A
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Deer Creek Porterville

Material Information

RAP Source: Stockpile
Aggregate Size:
Aggregate Source:
RAP Stockpile:
Stockpile Size (tons):
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 2

DIME Test ID: 2019-01-24-21-1
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 04/10/2019
Date Tested: 01/24/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RAP Sample3A T-30
Test Result Compliance:
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 99 %
Cumulative percent passing the 1/4 in. sieve 99 %
Cumulative percent passing the #4 sieve 72 %
Cumulative percent passing the #8 sieve 53 %
Cumulative percent passing the #16 sieve 37 %
Cumulative percent passing the #30 sieve 24 %
Cumulative percent passing the #50 sieve 15 %
Cumulative percent passing the #100 sieve 10 %
Cumulative percent passing the #200 sieve 7.8 %

Test 2 of 2

DIME Test ID: 2019-01-24-21-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 04/10/2019
Date Tested: 01/24/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: RAP Sample3A T-308
Test Result Compliance:
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of HMA Sample prior to ignition no data
Corrected Asphalt Binder Content 5.48 %
Mass Loss no data
Correction Factor (Percent by mass of HMA Specimen) no data
Moisture Content no data
Temperature Compensation Factor no data
Test Temperature no data