Print Report | Back to Sample Detail

Sample Record for 2014-06-13-10301772

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 209175 DEA: 030F2204 EFIS: 0300000072 QA Service Level: 1
DIST-CO-RTE-PM: 03-ED-50-R30.7/R31.7
Work Description: REPLACE BRIDGE.
Location Description: SLY PARK UNDERCROSSING
Contractor Name: VIKING CONSTRUCTION COMPANY, INC.
Contractor Address: P.O. Box 1508 , Rancho Cordova, CA 95741
Resident Engineer: Jarrett Woodruff Structure Rep.: Brandon Miller

Sample Information

DIME Sample ID: 2014-06-13-10301772
TL Number from the TL Form:
Sample Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Sample Organization Contact: (916) 852-5530
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 06/13/2014
Date that the sample was received by the laboratory/organization performing the testing: 06/13/2014
The quantity of what the sample constitutes: 6 cylinders
A brief description of the sample: Abutment 2 Stage 1 Concrete
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Folsom Ready Mix

Material Information

The concrete mix design number: SF718AFST0
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 74866
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Abutment 2 Stage 1
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 6

DIME Test ID: 2014-06-13-10301772-1
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Verified Date: 07/02/2014
Date Tested: 06/13/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Identification of concrete represented by the sample Abutment 2 Stage 1
Volume of the measure 4.003 ft^3
Density of concrete 142.9 lb/ft^3
Yield of concrete no data
Relative yield of the batch no data
Cement content no data
Air content no data

Test 2 of 6

DIME Test ID: 2014-06-13-10301772-2
Test Method: ASTM C1064-08: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 07/02/2014
Date Tested: 06/13/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Temperature 76 F

Test 3 of 6

DIME Test ID: 2014-06-13-10301772-3
Test Method: ASTM C143-10a: Standard Test Method for Slump of Hydraulic-Cement Concrete
Verified Date: 07/02/2014
Date Tested: 06/13/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Slump 8.75 inch

Test 4 of 6

DIME Test ID: 2014-06-13-10301772-4
Test Method: ASTM C231-10: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 07/02/2014
Date Tested: 06/13/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Air content 5.8 %

Test 5 of 6

DIME Test ID: 2014-06-13-10301772-5
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Verified Date: 07/07/2014
Date Tested: 06/20/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 1
Test performed no data
Comment on any defect in either specimen or caps (Max 250 Characters) no data

Test 6 of 6

DIME Test ID: 2014-06-13-10301772-6
Test Method: ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Verified Date: 07/16/2014
Date Tested: 07/11/2014
Submitted By Organization: Viking Construction Company, Incorporated - Rancho Cordova
Organization Address: 11315 Sunrise Gold Circle, Suite A,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: dfishback@vikingbridges.com
Organization Phone: (916) 852-5530
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 2
Test performed no data
Comment on any defect in either specimen or caps (Max 250 Characters) no data