Sample Record for 2017-12-27-1
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 209146 DEA: 06471504 EFIS: 0600000464 COOP: 061549
QA Service Level: 1
DIST-CO-RTE-PM: 06-TUL-99-39.6/41.3
Work Description: RECONSTRUCT INTERCHANGE WITH NEW PUMPING PLANT.
Location Description: TULARE COUNTY AT GOSHEN FROM 0.9 MILE NORTH OF ROUTE 99/198 WEST SEPARATION TO 0.2 MILE NORTH OF NORTH GOSHEN OVERHEAD
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 2716 Granite Court, Fresno, CA 93706
Resident Engineer: Brent Haroldsen Structure Rep.: Peter Moua
Sample Information
DIME Sample ID: 2017-12-27-1
TL Number from the TL Form: 982926 982927 982930
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 12/27/2017
Date that the sample was received by the laboratory/organization performing the testing: 01/04/2018
The quantity of what the sample constitutes: 12
A brief description of the sample: HRC 500 510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC HRC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #8,10
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 177275, 177488, A162884
Rebar Heat Number(s): 4069024, 4070783
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 9
DIME Test ID: 2017-12-27-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #8/25mm | 0.79 | 0.0011 | 72339 | 91568 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 2 of 9
DIME Test ID: 2017-12-27-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #8/25mm | 0.79 | 0 | 74186 | 93906 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 3 of 9
DIME Test ID: 2017-12-27-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #8/25mm | 0.79 | 0 | 74154 | 93866 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 4 of 9
DIME Test ID: 2017-12-27-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | #8/25mm | 0.79 | -0.0111 | 72098 | 91263 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 5 of 9
DIME Test ID: 2017-12-27-1-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | #8/25mm | 0.79 | 0 | 74747 | 94616 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 6 of 9
DIME Test ID: 2017-12-27-1-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | #8/25mm | 0.79 | 0 | 74225 | 93956 | OK Necking | Fred |
| |
Temperature
|
72 F
|
UTM
|
400KIP
|
Halo ID
|
Small
|
Test 7 of 9
DIME Test ID: 2017-12-27-1-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | #10/32mm | 1.27 | -0.006 | 118709 | 93472 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 8 of 9
DIME Test ID: 2017-12-27-1-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | #10/32mm | 1.27 | 0 | 118335 | 93177 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|
Test 9 of 9
DIME Test ID: 2017-12-27-1-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 01/05/2018
Date Tested: 01/05/2018
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | #10/32mm | 1.27 | 0 | 118280 | 93134 | necking okay | Fred |
| |
Temperature
|
72 F
|
UTM
|
2000KIP
|
Halo ID
|
Big
|