Sample Record for 2017-06-06-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 210794 DEA: 062HT104 EFIS: 0612000287 QA Service Level: 1
DIST-CO-RTE-PM: 06-FRE-99-23.5/26.7
Work Description: (Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST).
Location Description: State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing.
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 2718 Granite Ct , Fresno, CA 93706
Resident Engineer: Justin Kimura Structure Rep.: Daniel Chapa

Sample Information

DIME Sample ID: 2017-06-06-1
TL Number from the TL Form:
Sample Submitted By Organization: CT - Unassigned/General Field Laboratory
Sample Organization Contact: 5625005861
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 06/06/2017
Date that the sample was received by the laboratory/organization performing the testing: 06/07/2017
The quantity of what the sample constitutes: 125
A brief description of the sample: Resistance Butt Welded Hoops
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Martinez Steel Corporation

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): PL17101634
Hoop Manufacturer Lot Number(s): 15
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 7
Diameter of Hoop: 4'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: Martinez Steel
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 4

DIME Test ID: 2017-06-06-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke at Weld
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
115#7/22mm0.65109085150Bar Broke at WeldBrian
UTM 400KIP
Temperature 72 F

Test 2 of 4

DIME Test ID: 2017-06-06-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
215#7/22mm0.65343089050Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 3 of 4

DIME Test ID: 2017-06-06-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
315#7/22mm0.65333088880Bar BrokeBrian
UTM 400KIP
Temperature 72 F

Test 4 of 4

DIME Test ID: 2017-06-06-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/08/2017
Date Tested: 06/08/2017
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
415#7/22mm0.65338088970Bar BrokeBrian
UTM 400KIP
Temperature 72 F