Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 211657 DEA: 074P1304 EFIS: 0715000259 MINOR: 07A3986
QA Service Level: 1
DIST-CO-RTE-PM: 07-VEN-33-6.5/7.0
Work Description:
Location Description: In Ventura County
Contractor Name: JABRE CONTRACTING INC.
Contractor Address: 1813 MANZANITA LANE , MANHATTAN BEACH CA 90266
Resident Engineer: Alan Davis Structure Rep.: Unknown
DIME Sample ID: 2016-11-30-2
TL Number from the TL Form: C970927
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 11/30/2016
Date that the sample was received by the laboratory/organization performing the testing: 12/01/2016
The quantity of what the sample constitutes: 4
A brief description of the sample: Flash Welded Rebar Hoops
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Cascade
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Rebar Heat Number(s): 043916
Hoop Manufacturer Lot Number(s): 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 4
Diameter of Hoop: 2'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: TNT
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded
DIME Test ID: 2016-11-30-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | #4/13mm | 0.2 | 17342 | 86710 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-30-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | #4/13mm | 0.2 | 17961 | 89810 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|
DIME Test ID: 2016-11-30-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 12/01/2016
Date Tested: 12/01/2016
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: necking okay
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | #4/13mm | 0.2 | 18188 | 90940 | necking okay | Brian |
| |
UTM
|
75KIP
|
Temperature
|
72 F
|